
Tesla and Arevon team up on 172-Megapack solar plus project

03/17/2025 06:15 PM
Tesla and partner Arevon have completed the second phase of an energy storage site in Southern California, as highlighted in a short video shared this week.
On Monday, Tesla’s Megapack account on X posted a brief video on the Kern County, California “Eland” storage site, which was recently expanded to offer 300MW/1.2GWh of Megapacks supporting 758MW of solar. The so-called “Eland Solar-plus-Storage Project” site now features 172 Megapack units and 1.36 million solar panels, which the companies have previously said is roughly enough to power 200,000 homes annually.
In the video, Tesla also notes that the facility has site-level controls to regulate power output, “providing a firm resource to the grid,” and supporting the Los Angeles climate goal of reaching 100-percent renewable electricity by 2035. You can check out the clip below.
758 MW of solar supported by 1.2 GWh of Megapack at Arevon's site in Kern County, California pic.twitter.com/HTP92uYVIP
— Tesla Megapack (@Tesla_Megapack) March 17, 2025
READ MORE ON TESLA MEGAPACKS: Tesla Megapack project in California housed in former steam plant
Arevon announced the official start of operations for Eland 1 in December with 150MW/600 MWh, and the Eland 2 phase has effectively doubled this. The company also appears to be on track for its targeted opening of Eland 2 in Q1 this year, though it’s not clear at the time of writing if Arevon has yet announced a start of operations for the second phase.
Last February, Arevon announced that it secured a $1.1 billion financial commitment for the remaining parts of the Eland 2 Solar-plus-Storage project, together with Eland 1 becoming one of the largest solar-plus-storage installations in the U.S. The projects also include a long-term purchase agreement from the Southern California Public Power Authority, which plans to facilitate contracts for the LA Department of Water and Power and Glendale Water and Power.
Tesla’s grid-scale Megapack batteries can store and deploy generated energy to the electrical grid, especially during periods of peak power usage, high demand, or outages. Coupled with solar or other energy sources in these kinds of solar-plus-storage sites, Tesla’s Megapacks can help support renewable energy for long periods of time, or at least add stability to the grid.
Over the past couple of years, Tesla has been deploying large-scale Megapack projects in markets around the world, as backed by an initial production facility in Lathrop, California. This “Megafactory” aims to eventually produce 10,000 Megapack units, or 40 GWh, per year, and it has been ramping up production since late 2022.
In November, the Lathrop Megafactory officially produced its 10,000th Megapack, and Tesla also started production at a second Megapack plant in Shanghai, China last month, after starting construction on the site last May. The Shanghai Megafactory is also expected to have a volume annual production of 10,000 units per year.
Additionally, Tesla has teased plans for a third Megafactory, though it has yet to disclose where such a facility would be built.
Tesla’s massive Megapack site near Melbourne is almost ready
The post Tesla and Arevon team up on 172-Megapack solar plus project appeared first on TESLARATI.